Northwater Treatment Plant – Denver

pipe

Opportunities

During the Construction Phase, this project will call for all trades and participation for CPCS Divisions 1-46 from the subcontracting, MWBE and SBE communities. As a Denver Water project, requirements to be part of Denver Waters Security Prequalified Contractors List (SPCL), must be met. If your firm is not part of this prequalified list, we encourage you to follow the SPCL link below to view the requirements and submit for inclusion. We also encourage you to submit your company information in the BuildingConnected link below, this will allow your firm be included in Kiewit’s database for subcontracting opportunities not only on this project, but all local Kiewit projects.

Work Packaging Plan
Bid Package Scopes
BP08 – Site Services Opportunities Q3 2018
  • Job office supplies
  • Printing services
  • Catering
  • Courier services
  • Water and ice supply
  • Office trailer rental
  • Project trailer/office buildout (skirting, decks, etc…)
  • IT wiring
  • Office furnishings
  • Janitorial services
  • Chemical toilets
  • Waste management & recycling
  • 3rd party material testing
  • Survey & drone services
  • Security camera’s (time lapse, processing)
  • Temporary fencing, gates, and turnstiles
  • Security guard services
  • Erosion control & BMP installation
  • Temporary seeding for erosion control
  • Temporary project signage
  • Temporary underground utility installation (sewer & water)
  • Temporary electrical installation for project site
  • Miscellaneous construction buildings and foundations (Metal or canvas material storage buildings)
  • Street sweeping
  • Fuel supply
  • Traffic control
  • Potholing services
  • Lumber supply
  • Aggregate supply
BP02 – Access Improvements Q3 2018
  • Intersection signal improvements
  • Access road grading and asphalt paving
BP02C – Access Improvements Highway 93
  • Grading and drainage material supply and installation
  • Trucking
  • Aggregate supply and installation
  • Light and signal installations
  • Traffic control
  • Asphalt paving supply and installation
  • Striping
  • Erosion control and restoration supply and installation
BP01-009 – Early Large Bore Pipe
  • Supply of large diameter steel piping (24 inch to 78”)
BP01-016 – Concrete supply
  • Concrete material supply for project
BP01-017 – Rebar supply
  • Rebar and rebar accessory material supply for project (will not include rebar for BP10-001 or packages prior to BP12-002)
BP10-001/BP12-001 (Packages will be combined under single number of BP10-001) – Mass Excavation and Underslab Piping for Floc/Sed and Filters
  • Erosion control and stabilization supply and installation
  • Trucking
  • Aggregate supply and installation
  • On site material processing (crushing and screening)
  • Under drain material supply and installation
  • Large diameter pipe installation
  • Small diameter pipe supply and installation
  • Welding
  • Cathodic protection supply and installation
  • Concrete accessories
  • Formwork supply and installation
  • Rebar supply and installation
  • Concrete supply and installation for pipe encasements
  • Pipeline demolition
BP12-002 – Structures Concrete for Floc/Sed and Filters
    • Concrete accessories
    • Formwork and falsework supply and installation
    • Lumber supply
    • Concrete pumping
    • Rebar installation
    • Embed supply and installation
    • All scope pertaining to the construction of designated concrete structures from foundation slab to final concrete elevations (no architectural, mechanical, site concrete or building trades)
    • Underslab small diameter piping supply, installation, cathodic protection and plumbing
    • Misc. excavation and grading
    • Scaffolding, false work and temporary shoring
BP12-003 – Structures Concrete – All remaining
  • Concrete accessories
  • Formwork and falsework supply and installation
  • Lumber supply
  • Concrete pumping
  • Rebar installation
  • Embed supply and installation
  • All scope pertaining to the construction of designated concrete structures from foundation slab to final concrete elevations (no architectural, mechanical, site concrete or building trades)
  • Miscellaneous metals supply and installation (handrails, stairs, gratings, etc.)
Potential Subcontracting Opportunities
Some of the subcontracting opportunities for these projects are:
  • Traffic Control
  • Dust Control
  • Street Sweeping
  • Janitorial Services
  • Site Security
  • Material Testing
  • Fencing
  • Survey
  • Demolition
  • Abatement
  • Grading and Excavation (including aggregates)
  • Support of Excavation (SOE)
  • Site Finishes (C&G, Paving, Landscaping)
  • Reinforcing Steel supply and install
  • Concrete supply and install (Flatwork and Structural)
  • Masonry
  • Structural Steel supply and install
  • Lifting device supply and install (Gantry, Bride and Monorail Cranes)
  • Miscellaneous Metals
  • Building Finishes (Architectural - All types and trades Div. 2- 31)
  • Piping supply and install (Above and below grade)
  • Process equipment supply and installation
  • Electrical (EI&C)
Firms interested in submitting sub-tier bid pricing for this project can contact pre-qualified bidders. Contacts for pre-qualified bidders to bid package scopes are listed below:
GMP02C – BP02-001, Access Roadway Development: GMP04A – BP10-001, Mass Excavation and Underslab Piping for Floc/Sed and Filters: GMP04B – BP12-002, Structures Concrete for Floc/Sed and Filters:
BuildingConnected
To register as a subcontractor with Building Connected, click here.
SPCL
For more information about SPCL, click here.

For more information about Denver Waters Supplier Diversity Program, click here.